Youth sport training center in Dnipro
Students Name: Laba Halyna Romanivna
Qualification Level: magister
Speciality: Industrial and Civil Construction
Institute: Institute of Civil Engineering and Building Systems
Mode of Study: part
Academic Year: 2020-2021 н.р.
Language of Defence: ukrainian
Abstract: Laba G.R., Bula S.S. (supervisor). Youth sport training center in Dnipro. Master’s thesis. – Lviv Polytechnic National University, Lviv, 2020. Extended abstract. The design and development sport development centres is an extremely important aspect of humanitarian policy and should be one of the main tasks of society. An increase in the number of sport centres is planned as part of the reform of science and education. According to the Ministry of Education and Science, there is a shortage of sport centers in Ukraine. At the same time, a lot of children are listed in the queue for a place in sport centre. The first section analyzes the spatial planning and design solutions of the building. The initial information on the construction site, the main indicators of the general plan and the main materials for finishing works are given. The main technical solutions are given. The second section presents the calculation of building structures for the first and second groups of boundary conditions, namely: slab, columns, girder and founations. In the third section the technological map for installation works was offered, the choice of a way of conducting works is executed. The main parameters of the construction master plan of the construction site were also calculated and the calendar schedule of construction was given. In the fourth section, the local and object construction estimates were calculated. The fifth section describes the numerical studies to determine the fire resistance of the column subjected to the fire. Appropriate drawings for the architectural-construction and technological-organizational part of the project were made. Study object: architectural and construction, engineering and design, technological, economic and scientific aspects in the design of the sport centre Scope of research: sport centre Goal of research: designing a sport centre in Dnipro . The building of the children’s complex is one-storey with a basement, of different heights, with a protruding volume of the gym. Children’s complex is designed for training sessions on sports games (badminton, basketball, volleyball), there are halls of individual strength training and the composition of the premises for shooting (shooting range). One-time maximum capacity of the complex - 24 people per shift. Keywords: sport centre, calculation of structures, technological map, master plan, column References. 1 DBN B.2.2-9-99 Public buildings and structures, Ministry of Construction of Ukraine, K: 1995 2 DBN B.2.6-98: 2009 “Concrete and reinforced concrete structures” - K :, 2011. 3 DBN A.3.2-2-2009 Occupational safety and industrial safety in construction., K-2012. 4 DBN B.2.6-31: 2006 "Thermal insulation of buildings". / State Construction Committee of Ukraine, 2006 5 DBN B.1.-7-2002. Fire safety of construction objects / State Construction Committee of Ukraine, 2003