Adjustment of Heat Power Engineering Units

Major: Heat and Power Engineering
Code of subject: 7.144.02.O.011
Credits: 4.00
Department: Heat Engineering and Thermal and Nuclear Power Plants
Lecturer: Senior Lecturer, Yurasova Oksana
Semester: 2 семестр
Mode of study: денна
Learning outcomes: As a result of studying the module, the student must: - know the basic methods and methods of debugging and researching equipment, devices (devices) used for debugging and research; methods of mathematical processing of debugging results; - be able to apply the necessary method to study a particular problem, apply the necessary literary sources, independently carry out some work on the adjustment and research of individual objects
Required prior and related subjects: pre-requisites: technical thermodynamics, heat and mass exchange, fuel furnaces and boiler installations, turbines of thermal and nuclear power plants; korekviziti: operating modes of thermal power plants, operation of facilities of thermal power stations.
Summary of the subject: Classification and organization of tests of steam and water heating boilers. Adjustment works. Operational tests. Regimen and adjustment works. Test sequence. Stages of tests. Preparation for tests. Preparation of technical and work programs. Checking the quality of sawing, performance of nozzles. Tarpaulin sections of gas pipelines. Determination of airflow in the fuel boiler, in the pylosystem, in a separate section of convection gas flues. General principles for sampling and preparation of solid fuel samples. Sit analysis. Sampling of liquid and gaseous fuels. Accounting for fuel consumption. Determination of the optimum values of the coefficient of excess air and the size of coal particles. Determination of the optimal position of the torch in the fuel. Setting up and researching the systems of sawing and their equipment. Tests of pylosystems with different types of mills. Set up and study of natural circulation in the screens of steam boilers. Classification and organization of tests of steam turbine plants. Checking the manufacturer's factory warranty and determining the actual equipment characteristics. Efficiency of modernization or reconstruction of the turbine's main part. Control of equipment during operation. Investigation of turbine regulation systems. Removal of static control characteristic. Test of turbines with reduced load. Tests of centrifugal pumps. Adjustment and research of the work of the capacitor and deaerator. Heat engineering measurements during adjustment and research work. Writing a report on the work done. Accuracy of test results.
Assessment methods and criteria: • Current control (30%): work in practical classes, written reports on laboratory work, oral questioning • Final test (70%), exam paper.
Recommended books: 1. Operation and adjustment of power equipment of the TPP of Zakhidenergo OJSC / as general edited by P.Omelyanovsky, J.Mysaka. -Lviv: "Ukrainian Technologies", 2005 -412c. 2. Deev LV, Balakhnichev N.A. Boiler plants and their maintenance: practice. a manual for a vocational school. - M .: Vyssh. Shk., 1990. - 239 p. 3. Vnukov A.K. Experimental works on steam generators. - Moscow: "Energy", 1971.

Adjustment of Heat Power Engineering Units (курсовий проєкт)

Major: Heat and Power Engineering
Code of subject: 7.144.02.O.012
Credits: 3.00
Department: Heat Engineering and Thermal and Nuclear Power Plants
Lecturer: Senior Lecturer, Yurasova Oksana
Semester: 2 семестр
Mode of study: денна
Learning outcomes: - Know the basic techniques and methods of establishing and research equipment; instruments (instruments) used for debugging and research; Mathematical methods of processing the results of adjustment; - Be able to apply the necessary method to study the problem; apply the necessary literature; - Be able to independently carry out some work on establishing and studies of individual objects.
Required prior and related subjects: - methods of the analysis of the indices of thermal power plants; - fundamentals of reconstruction and modernization of thermal power plants.
Summary of the subject: Test pryamotechiynyh and drum boilers. Research and establishment of technology start-up boiler. Research and establishment of technical water power station. Testing and debugging system cleaning flue gases. Debugging and study of pulverization and their equipment. Test pylosystem with different types of mills. Debugging and research in the natural circulation boilers screens. Classification and organization of test facilities steam turbine control systems Research. The test turbine with reduced stress. Test of centrifugal pumps. Debugging and investigation of the condenser and deaerator.
Assessment methods and criteria: - Current control (30%): oral examination - Final control (70%), defense of course work.
Recommended books: 1. Operation and adjustment of power equipment TPP "Zakhidenergo" / Under the general editorship P.Omelyanovskoho, Y.Mysaka. -L'VIV: Firm "Ukrainian technologies", 2005. -412s. 2. Malyarenko VA Power plants. General course: a tutorial. - 2nd edition. - Kharkov: "He issued. SAGA ", 2008. - 320 p. 3. Sokolov BA Boiler installation and operation: a textbook for beginning. prof. education. - 2nd ed.. - Moscow: Izdatelsky center "Academy", 2007. - 432 p.